FOR EXISTING CUSTOMERS
Enter the access code we sent you and check your mold’s machining progress at any time — every step photographed on the shop floor the same day.
INDUSTRY
Fluid handling, diagnostic housings and lab consumables in medical grades – repeatable to +/-0.01mm and traceable per lot.
INDUSTRY
Clean, traceable and repeatable. Medical programs are not about the first shot – they are about the ten-thousandth shot being identical to the first.
| Process | Equipment | What it means for your part |
|---|---|---|
| Fluid-handling parts | PP, PA12, PVDF | Low flash, no weld lines, burr-free openings for connectors and fluid paths. |
| Diagnostic housings | PC, ABS, PC/ABS | Tight cosmetic tolerances and texture-matched cavity finishes. |
| Lab consumables | PP, PS, PET | High-cavity tools with hot-runner systems for short cycle times. |
| Implant-adjacent | PEEK, PEEK | Documented material grades with full per-lot traceability. |
| Cleanroom production | PP, PE, HDPE | Batch segregation and CoO issued per lot for cleanroom supply chains. |
Medical molding is not about the first shot. It is about the ten-thousandth shot being identical to the first, with paperwork that proves it. Medical programs run on documented resin grades, segregated batches, measured dimensions and a material record for every lot, which is why the mold, the process and the documentation are treated as one job rather than three.
We build medical injection molds and mold the parts on our own machines, with hot-runner capability for parts that cannot show a weld line, and in-house CMM inspection that holds critical dimensions to ±0.01mm. The Mold, the resin and the measurement records all come from the same 1,200 m² site in Ningbo.
| Process | Materials | What it means for your part |
|---|---|---|
| Fluid-handling parts | PP, PA12, PVDF | Low flash, no weld lines, burr-free openings for connectors and fluid paths. |
| Diagnostic housings | PC, ABS, PC/ABS | Tight cosmetic tolerances and texture-matched cavity finishes. |
| Lab consumables | PP, PS, PET | High-cavity tools with hot-runner systems for short cycle times. |
| Implant-adjacent components | PEEK | Documented material grades with full per-lot traceability. |
| Cleanroom supply chains | PP, PE, HDPE | Batch segregation and a certificate of conformity issued per lot. |
The resin grade, not the polymer family, decides the documentation. A medical program usually names a grade: a specific PP copolymer for a fluid path, PC or PC/ABS for a housing, PA12 where the part has to survive a disinfectant, PEEK where the part runs hot. If the drawing only says “PP”, we will ask which grade it is and whether the part is patient-contact, food-contact or lab-contact, because the answer changes both the resin and the paperwork.
Several of these polymers are sensitive to moisture. PC and PA12 are hygroscopic and have to be dried before molding, because moisture shows up as silver streaks on the surface and as dimensional drift. On a clear housing the difference between a dried and a wet shot is the difference between a usable part and a scrapped one.
| Document | What it covers | When it is issued |
|---|---|---|
| MTR (material test report) | The resin batch behind the parts | Per lot |
| CoO / CoC (certificate of conformity) | Conformance to the specification you ordered against | Per lot |
| Dimensional report | Measured values for the dimensions called critical on the drawing | With first articles, and on request per batch |
| CMM report | Full measurement of the features that matter, against the drawing | On request, per batch |
| Batch records | Resin lot, tool, machine, date and operator | Kept for each production lot |
These are the documents we can issue from our own production records. What we do not issue is a certification of your finished device, because that belongs in your own regulatory file. The honest position is that we supply the resin traceability and the measured dimensions that go into it, and we will tell you which of our records your quality system can use.
| Defect | Why it is a problem | How we control it |
|---|---|---|
| Flash | A raised edge on a sealing surface or a fluid path | Gate position and gate size reviewed in DFM, with the steel fitted and trimmed before the first shot |
| Weld line | A visible and weaker line where two flows meet | Hot runner on critical parts, and the gate placed away from sealing surfaces |
| Sink mark | A visible pull in a thick section, and a pocket that can hold residue | Even wall thickness, balanced cooling, and the gate placed on the heavy section |
| Short shot | An incomplete fill, normally at the end of the flow | Cavity venting, adequate injection and hold pressure, and a balanced cavity |
| Warpage | A flat part that does not stay flat, which breaks an assembly | Shrinkage compensation in the tool and symmetric cooling around the cavity |
| Contamination | A residue or an inclusion in a cleanroom supply | Batch segregation, cleaned mold and a documented resin lot |
| Burr at an opening | A rough edge on a part a user touches | Gate on a cosmetic face, and hand trimming where the drawing calls for it |
First articles are molded from the finished tool, measured, and sent to you with the dimensional report before the tool is released for production. A standard medical tool typically reaches first articles in the same 15–25 day window we quote for injection molds, depending on the number of cavities and whether a hot runner is needed. Mold validation and any customer-side documentation are prepared from your drawings and our production records, so tell us the format your quality system expects and we will work to it.
Parts are cleaned, bagged and boxed in lots that keep the batch segregation intact, with the lot number on the carton so the documentation and the parts travel together. Molds are crated, marked with the drawing number and the cavity position, and shipped with the maintenance and cleaning instructions. The tool belongs to you once it is paid for, and the production records stay with your orders for as long as you run the part.
Send the drawing in STEP, IGES, DWG, DXF, STL or PDF, with the resin grade, the regulatory market and the tolerance-critical dimensions, and we reply with a DFM review and a quotation within one working hour.
Tell us the material grade and the certification you need – we will confirm what we can document and what we cannot.
MEDICAL AND FOOD CONTACT
What you specify on the drawing decides the resin, the cavity finish and the documentation that ships with the parts.