PROJECT BACKGROUND

A structural connector for a European Tier-1 supplier, on a compressed launch schedule.

Glass-filled ABS, eight cavities, critical features held to ±0.04mm, and a validated tool in fifteen days from drawing release. The customer needed a three-week window, not a three-month one.

8Cavities
±0.04mmTolerance on named features
38 secCycle time
15 daysDrawing to T1 (typical mold)

Customer requirement

A structural connector in ABS + 10% glass fiber, with ±0.04mm on the critical features that carry load, produced in a multi-cavity tool and released to production inside a compressed launch window. The drawing arrived with a target price already fixed, which left the mold structure as the only place to create value.

Key challenge

Eight cavities of a glass-filled part, with warpage and sink marks under the critical ribs. Each extra cavity cuts the cycle time but tightens the cooling window, and glass fiber fills the cavity corners faster than a virgin resin will. The gating and cooling had to be right before the steel was ordered, because a rework at that stage is a new tool, not a repair.

Mold structure

A multi-cavity hot-runner tool with an 8-cavity hardenable on a P20 mold body and S136 cavity cores, so the critical dimensions stay put through the life of the tool rather than drifting after the first few thousand shots. A simulated filling study on the real part geometry settled the runner layout and the cooling before the first block of steel was cut. The tool was cut, wired and polished in our own toolroom; see the photographs further down this page.

Inspection method

T1 samples were cut, measured on our own CMM and shipped for approval inside the 15-day window — before production steel was cut. In production, critical dimensions are inspected on every part and the remainder are sampled, with per-lot MTR and CoO documentation issued with each batch. The features the customer named are the ones we measure on every shot; nothing else is quietly treated as “good enough”.

Result

An 8-cavity tool running a 38-second cycle, holding ±0.04mm on the features the customer named, with T1 samples delivered inside the launch window and production parts shipping with per-lot traceability. Lead time and tolerance here are quoted for a typical mold of this complexity — your own project gets the same treatment in writing before steel is ordered.

Related

This project ran ABS + 10% glass fiber. Read our ABS injection molding guide and our glass-fiber reinforced molding guide for the shrinkage and mold notes behind this design. If you are budgeting a similar tool, see what an injection mold costs and how long the tool takes.

Have a similar connector or precision plastic part?

Upload your 2D / 3D drawing for DFM review and mold cost estimate.

Upload Drawing for Review

FROM OUR OWN TOOLROOM

Photographs of tools, not renderings.

Every image below is a tool that came out of our own shop in Yuyao — designed, cut, wired, polished and assembled by our own people. The connector above was built in the same toolroom, with the same CNC, EDM and wire-cutting capacity described on our equipment page.

Related: custom injection mold manufacturing · plastic injection molding services · automotive injection molds · more case studies

WhatsApp us